- KCII Radio - http://kciiradio.com -

Washington Co. Secondary Roads Lays Out Five Year Plan

Posted By News On @ 6:28 am In Today's Local News | Comments Disabled

Audio clip: Adobe Flash Player (version 9 or above) is required to play this audio clip. Download the latest version here [1]. You also need to have JavaScript enabled in your browser.

press play to hear from interim Engineer Jacob Thorius

Washington County’s Secondary Roads Department is laying out its five year construction plan. Interim Engineer Jacob Thorius says it’s something the state requires them to submit every year. He says some of the top priorities identified in the plan include about ten bridges that need replaced, and several miles of the Riverside Road that need repaved. Thorius says the plan identifies more than 23-million dollars in projects. He says they have about 10-million dollars to work with.


Article printed from KCII Radio: http://kciiradio.com

URL to article: http://kciiradio.com/2010/04/washington-co-secondary-roads-lays-out-five-year-plan/

URLs in this post:

[1] here: http://www.adobe.com/shockwave/download/download.cgi?P1_Prod_Version=ShockwaveFlash&promoid=BIOW

[2] Play: http://media.blubrry.com/kciiradio/p/www.kciiradio.com/wp-content/uploads/2010/04/00241-Jacob-Thorius.mp3

Copyright © 2005-2013 KCII Radio