- KCII Radio - http://kciiradio.com -

New Sewer Line Likely to Head West

Posted By News On @ 7:23 am In Today's Local News | Comments Disabled

[simage=1080,400,y,center]

Audio clip: Adobe Flash Player (version 9 or above) is required to play this audio clip. Download the latest version here [1]. You also need to have JavaScript enabled in your browser.

press play to hear from Fox Engineering’s Scott Renaud

A likely path for a sewer line that will connect Washington’s Sunset Park collection point to the new wastewater plant has emerged. Ames based Fox Engineering is the consultant on the project. The company’s Scott Renaud says the pipe will swing out on the west side of town then cut south to the new plant. He says this gravity fed system is the cheapest, simplest option and eliminates the need for a pump station in the park. The new sewer line is expected to cost in excess of three million dollars. Fox Engineering anticipates that construction will start this fall. Bids for construction on the new wastewater plant are scheduled for November


Article printed from KCII Radio: http://kciiradio.com

URL to article: http://kciiradio.com/2010/05/new-sewer-line-likely-to-head-west/

URLs in this post:

[1] here: http://www.adobe.com/shockwave/download/download.cgi?P1_Prod_Version=ShockwaveFlash&promoid=BIOW

[2] Play: http://media.blubrry.com/kciiradio/p/www.kciiradio.com/wp-content/uploads/2010/05/Scott-Renaud.mp3

Copyright © 2005-2013 KCII Radio