Washington’s Fall Cleanup took place last week but many were unable to participate due to construction. Washington City Engineer Rob McDonald says residents on South 9th Avenue between Washington and Van Buren Street will have the opportunity to participate in their own Fall Cleanup November 15th through the 19th.  For questions about the delay or the status of the Fall 2010 paving project, call the Washington Engineer’s Office653.9945.

Tags: , , , ,